1.
Approval of July 20, 2022 minutes
2.
355 King St., Removal of 3/4 of chimney and leave stainless steel liner vent pipe for gas furnaces
3.
Administratively Approved
3.I.
824 High St., Replace existing roof materials with like in-kind architectural shingles. 8-25-22
3.II.
832 High St. Replace existing roof materials 3 tab with like in-kind architectural shingles. 8-25-22
3.III.
69 N Charlotte. Remove and replace 10 windows like in-kind PRS 5100 series style. 9-26-22
3.IV.
103 N Hanover St. Replace two existing columns with in-kind wood composite to match existing. Like in-kind and painted white to match. 10-17-22
3.V.
237 Beech St. Replace existing roof materials with like in-kind architectural shingles. Pristine Hearthstone color. 10-17-22
5.I.
Approve 2023 Meeting Dates